8:05am- CU moving gas line in order for contractor to proceed with storm drain
9:25am- Heading West on Pine street excavating for light boxes and conduit.
10:08am- Set 30'of 2" conduit, 100' of 1" conduit and 20' of 15" HDPP pipe heading West on Pine towards the curb inlet and finished at station 2+00.00.
1:45pm- Excavated, formed and placing base down for the sidewalk in between both drives for the church parking lot.